• Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
  • Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
  • Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
  • Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
  • Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
  • Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine

Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine

Lines: 2/4lines
Voltage: 380V
Seals Mode: Bottom Sealing
Speed: High
Continuous-Rolled: No
Sealing & Cutting: Heat-Sealing Cold-Cutting
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Other product recommendation
  • workshop picture
  • Group picture with customer
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Layer
Double
Machine Type
Hot Sealing and Cold Cutting
Computerized
Computerized
Type
Plastic Bag Making Machine
Sealing Knife
Copper
Machine Wall
10mm
Transport Package
Film Package
Specification
600-1500mm
Trademark
xingpai
Origin
China
HS Code
8477309000
Production Capacity
10000

Product Description

Product Description

The advantage of machine :
1.four line feeding ,high output 
2.Eura inverter _taiwan brand .good quality 
3.sealing bar with heater,can sealing
thick bag well 
4.sealing knife with air tube,to prevent stretch  ,cutting knife with air tube,it can make longer bag ,no need worker to pull bag

Product Parameters

Specification:

Model XP-CC 600C XP-CC 800C XP-CC 1000C XP-CC 1200C
width of sealing &cutting(mm) 500*2/250*4 700*2 /300*4 900*2 /400*4 1100*2/500*4
length of sealing & cutting(mm) 1200 1200 1500 1500
speed of bag-making 240-480(pcs/min)
Power of motor(kw) 1.1 1.5 1.5 1.5
Weight(kg) 1000 1000 1200 1300
Outline dimension 3.6*1.3*1.7 3.8*1.5*1.7 4.2*1.7*1.7 4.5*1.9*1.7
 
Detailed Photos

 

Bottom Sealing Bag Garbage Bag Plastic Bag Making MachineBottom Sealing Bag Garbage Bag Plastic Bag Making MachineBottom Sealing Bag Garbage Bag Plastic Bag Making MachineBottom Sealing Bag Garbage Bag Plastic Bag Making Machine
Other product recommendation

 

Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
workshop picture

 



Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
Group picture with customer

 

Bottom Sealing Bag Garbage Bag Plastic Bag Making MachineBottom Sealing Bag Garbage Bag Plastic Bag Making Machine
Packaging & Shipping

 

Bottom Sealing Bag Garbage Bag Plastic Bag Making Machine
FAQ

 

1.:Are you factory or trading company ?
we are factory specialized in plastic machine  for many years  ,all of our engineer with more than 20 years experience .

2. Where is your factory? How can i visit your company?
our factory is located in Ruian city,zhejiang province, China.

Its about 40 minutes from shanghai by plane(4 hours by train).we will pick you up on airport or station .welcome to visit our factory

3 How long is your delivery time?
 On normal our delivery time is 30-45 days .if you need it ugently ,we can make your machine first.about 10 days

4.:What's your warranty policy?
18 month guarantee and whole life maintance ,
 
5:What package do you use for the product?
Be Coated with anti-corrosion oil, and covered with plastic film,  wooden box package need extra cost .
 
6:Does your factory provide installation service?
Our engineer can go to customer factory to installation . buyer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 100USD/Day per person since the day start out until the day arriving at factory.

7:What are your terms of payment?
We accept T/T, L/C. western union.

8. How could we do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

9: Does your engineer understand English?

A: Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company
Registered Capital
5000000 RMB
Plant Area
101~500 square meters